Home
About us
Company Introduction
Honor
Corporate culture
News & Events
Corporate News
Corporate business
Ultra clean emission
Desulphurisation (acid removal) operations
Denitrification business
Remove dust
Fly ash conveying
Fly ash stabilization
Engineering performance
Ultra clean emission
Desulfurization (deacidification)
Denitration
Remove dust
Fly ash conveying
Fly ash stabilization
Contact us
Contact Us
Join Us
National regulations
National regulations
LAN:
EN
CN
EN
National service hotline
400-117-5858
LAN:
EN
CN
EN
Focus on atmospheric control and enjoy free breathing
Focus on atmospheric governance and enjoy free breathing
Corporate News
Location:
Home
>
News & Events
華星東方 開工大吉
2022.02.08
金牛辭歲寒風(fēng)盡,玉虎迎春福氣來。
正月初八,我們開工了!
Prev:華星東方承建的浙江省金華市第二生活垃圾焚燒發(fā)電項(xiàng)目煙氣凈化工程通過72+24小時(shí)試運(yùn)行
Next:華星東方給您拜年了!
Back
2025.09.29
The procurement team of Wangneng Environment Group visits HEPT to carry out quality tools of Traceability training and technical exchange activities
Recently, the procurement management of Wangneng Environment and its purchasing teams of incineration plants visited the Wuxi manufacturing and R&D center of HEPT to carry out an in-depth visit, guidance and traceability training activity. The deputy GM and chief engineer, on behalf of HEPT, extended a warm welcome to the guests and accompanied them throughout the visit, study and exchange.
2025.09.24
The FGC system of the Yihai Kerry rice-husk carbon heat cogeneration waste heat boiler, Changsha, Hunan, constructed by HEPT, has passed the 168-hour trial operation
The FGC system of the Yihai Kerry rice-husk carbon heat cogeneration waste heat boiler, Changsha, Hunan, constructed by HEPT, has passed the 168-hour trial operation since June 12th 2025.
2025.09.19
The FGC system undertaken by HEPT of the waste incineration power generation upgrading project in Jinzhou, Shijiazhuang, Hebei Province, has started construction
The FGC system undertaken by HEPT of the waste incineration power generation upgrading project in Jinzhou, Shijiazhuang, Hebei Province, has started construction since 5th. Aug 2025 and has been finished on 27th. Aug to pass the preliminary acceptance.
2025.05.30
The FGC system of the Xinxing Municipal Solid Waste Incineration Power Generation Project in Yunfu, Guangdong, undertaken by HEPT, has started construction
The FGC system of the Xinxing Municipal Solid Waste Incineration Power Generation Project in Yunfu, Guangdong, undertaken by HEPT, has started construction since 20th. March 2025.
2025.05.28
The FGC system of the household waste incineration power generation project in Lichuan, Hubei Province, undertaken by HEPT, has started construction
The FGC system of the household waste incineration power generation project in Lichuan, Hubei Province, undertaken by HEPT, has started construction since 4th. Nov 2024.
About us
Company Introduction
Honor
Corporate culture
News & Events
Corporate News
Corporate business
Ultra clean emission
Desulphurisation (acid removal) operations
Denitrification business
Remove dust
Fly ash conveying
Fly ash stabilization
Engineering performance
Ultra clean emission
Desulfurization (deacidification)
Denitration
Remove dust
Fly ash conveying
Fly ash stabilization
Contact us
Contact Us
Join Us
National regulations
National regulations
National service hotline
400-117-5858
FollowYouTube
Follow Tiktok
Legal Notices
Site Map
Website statistics
Copyright ? 2021 Jiangsu Huaxing East Environmental Protection Technology Co., Ltd.All Rights Reserved. 備案號(hào):
蘇ICP備16018214號(hào)